How to Install Sleep-Guard
What's In the Box
Sleep-Guard Assembly Steps
Step 1: Insert Magnetic and Rubber Strips
Place the Bottom Rail Magnetic Strip and the two Side Rail Rubber Strips into their respective grooves and press firmly to snap them in.
Note: If you have chosen the drill-in installation, skip this step for now to facilitate drilling.
Step 2: Arrange Rails by Numbered Labels
Lay the top and bottom rails on a clean, flat floor, following the sequence of the numbered labels. Ensure they are parallel with the inner channels facing inward. Position the two side rails on either side, also with their inner channels facing inward, to prepare for assembly.
Step 3: Connect the Rails
Connect the two side rails to the top and bottom rails. Ensure each corner snaps firmly into place to form a secure frame.
Step 4: Align the Pull Cords
Check that the pull cords are centered and not snagged or pinched, ensuring the shade can operate smoothly.
Step 5: Operation Test
Close the shades to test the assembly and ensure everything functions correctly.
No-Drill Installation
Step 1: Peel off Protective Film
Remove the protective film from the adhesive side of the sealing strips.
Step 2: Apply Sealing Strips to the Frame
Attach the sealing strips to all four sides of the Sleep-Guard frame. Ensure full coverage with no gaps. Do not stretch the strips when going around corners; keep them relaxed to form a perfect 90-degree angle. Stretching may cause light leaks at the corners.
Step 3: Install into Window Recess
Tilting and pushing the Sleep-Guard frame into the window recess for a snug, no-drill fit.
Drill-in Installation
Video Tutorials
Step 1:Place into Window Recess
Tilt the shade into the bottom of the window recess and push it into position. Ensure the bottom of the shade remains parallel to the window frame, then push the top into place.
Step 2: Drill and Screw Fixation
Use an electric drill to create pilot holes through the pre-drilled points on the side rails into the window frame, then secure them with screws. Please note: for units where the bottom rail exceeds 80cm, screw fixation is required by default for added stability.
Protect the Cords
Use a tool to move the pull cords aside while drilling to avoid scratching or cutting them.
Step 4: Install Side Rail Rubber Strips
Place the two rubber strips into the side rail grooves. Lift the fabric slightly during installation to allow the strip to seat properly, then tuck the pull cord into the strip's channel.
Step 5: Press to Secure
Press down firmly along the Side Rail Rubber Strips to ensure they are fully snapped in.
Step 6: Install Bottom Magnetic Strip & Test
Insert the Bottom Rail Magnetic Strip into its groove and press to secure. Finally, test the operation of the shades by opening and closing them.
Sleep-Guard Cellular Shades - FAQ
Q1: What if the shade doesn’t slide smoothly after assembly?
Q1: What if the shade doesn’t slide smoothly after assembly?
A: Check the pull cords first. Ensure they are centered and not caught or twisted within the side rails. Also, verify that the frame is perfectly rectangular and not skewed.
Q2: I see tiny light leaks at the corners of my no-drill installation. How can I fix this?
Q2: I see tiny light leaks at the corners of my no-drill installation. How can I fix this?
A: This usually happens if the sealing strips were stretched during application. Peel them off and re-apply them without pulling or tension, ensuring they form a relaxed 90-degree angle at the corners for a light-tight fit.
Q3: How do I avoid damaging the cords during a drill-in installation?
Q3: How do I avoid damaging the cords during a drill-in installation?
A: Before drilling, use a small tool (like a screwdriver or the provided spacer) to gently push the pull cords away from the drilling path. Double-check the cord position before each hole.
Q4: Can I switch from a no-drill to a drill-in installation later?
Q4: Can I switch from a no-drill to a drill-in installation later?
A: Absolutely. If you decide to switch to a more permanent fix, you can drill directly through the pre-marked points on the side rails and secure them with screws. There is no need to remove the sealing strips—they will continue to provide a light-tight seal.
Need More Help?
Our team is here to make your installation smooth and stress-free.
If you have questions about measurements, compatibility, or setup, don’t hesitate to reach out — we’re happy to help.
Contact us at service@kurlax.com for personalized support or check our Measure Guide now.